The build loop
A scheduled sync failed on a Monday. What happened next is the build loop: four stages, two owner gates, and a failure that leaves something written at each stage it touches.
Read the piece →The GTM loop
Marketing got faster. The subtler change is that the site, the campaigns, the CRM and the reporting became one system, because the joins used to be people.
Read the piece →